For small & mid-size manufacturers

Machine-specific lockout/tagout procedures your crew can actually follow.

Build a visual LOTO placard for each machine in about 10 minutes: photos of every isolation point, auto-written shutdown and restore steps in English and Spanish, a QR code to the current version, and annual inspection tracking. No consultant. No sales call.

No credit cardPrint-ready PDFWorks on your phone at the machine

Missing machine-specific procedures is the most-cited lockout/tagout violation.

OSHA requires a written energy control procedure for each machine with hazardous energy (29 CFR 1910.147(c)(4)), plus a periodic inspection of every procedure at least once a year ((c)(6)). Most small shops have a generic program binder and a few Word documents, if anything.

#4Lockout/tagout's rank on OSHA's FY2025 Top 10 most-cited standards, with 2,562 violations.
#11910.147(c)(4)(i), "develop procedures," was the most-cited general-industry subsection in FY2025 (532 citations).
$16k+Maximum penalty per serious violation. A single inspection can find several.

Sources: OSHA Top 10, Safety+Health (final FY2025 data), J.J. Keller FY2025 subsection analysis. Penalty maximums are adjusted annually for inflation.

From blank page to posted placard in four steps

1

Pick a machine

Start from a template (CNC mill, lathe, press, compressor, conveyor…) or a blank procedure.

2

List energy sources

Add each disconnect, valve and stored-energy hazard. Snap a photo of every isolation point from your phone.

3

Print or order

Download the placard and isolation point labels, or have them made as hard signs or stickers and shipped to you.

4

Inspect yearly

Log the annual periodic inspection, print the certification record, and get a reminder before the next one is due.

Everything a small shop needs. Nothing it doesn't.

📷

Visual placards

Color-coded energy codes (E1, P1, H1…) with a photo of each disconnect and valve, so nobody guesses which one to lock.

🌎

English + Spanish

Built-in step text and energy terms in both languages, side by side or one at a time. Add your own Spanish for custom notes.

✅

Completeness checker

Flags missing elements that 1910.147(c)(4)(ii) calls for: intended use, isolation steps, lock responsibility, verification.

🔳

QR to the current version

Every placard has a QR code that opens the latest revision on any phone, so outdated paper copies are easy to catch.

🗓️

Annual inspection log

Record periodic inspections, print certification records, and see which machines are overdue at a glance.

🏷️

Isolation point labels

A matching E1/P1/H1 label for every disconnect and valve, so the placard and the machine speak the same language. Print on waterproof Avery sheets.

📦

Printed & shipped

Don't want to print? Order hard aluminum signs or vinyl stickers plus labels, made and shipped to your door.

📚

One-click binder

Export every procedure as a single PDF for your safety binder, an insurance auditor, or an OSHA visit (Pro).

How LotoKit compares

Word / Excel templateConsultant or enterprise softwareLotoKit
Time per machine1–2 hours of formattingWeeks of scheduling~10 minutes
Photos of isolation pointsManual copy-pasteYesYes, from your phone
Spanish versionTranslate it yourselfOften extraBuilt in
Annual inspection trackingSeparate spreadsheetYesYes, with reminders
CostYour timeQuote-based, sales-ledFree for 3 machines, then $39/mo

Simple pricing

Less than the cost of one hour of a consultant's time per month.

Free

$0
  • 3 machine procedures
  • Bilingual PDF placards with QR
  • Photos of isolation points
  • Completeness checker
  • Annual inspection log
Start free

Done-for-you

$149/machine
  • You send photos; we go over each machine on a video or phone call
  • A manufacturing engineer writes each procedure in LotoKit
  • You review, approve and print
  • Typical turnaround: 3 business days
  • Need someone on site? Request a consultation for a quote
Request a quote

Want us to write them for you?

A manufacturing engineer writes every procedure in LotoKit for your review, usually within 3 business days of having what we need. $149 per machine when you send photos and we talk it through by video or phone; your first one is free so you can judge the quality. Need someone on site? Choose a site-visit consultation below and we'll quote it for your location.

How would you like to work with us? *

We reply within one business day. No spam, no mailing list.

Frequently asked questions

Will LotoKit make us OSHA compliant?

No software can do that by itself, and we won't pretend otherwise. LotoKit helps you write procedures that contain the elements 1910.147(c)(4)(ii) calls for, print them clearly, and keep periodic inspection records. You still need to verify each procedure on the actual machine, train your employees, and run your energy control program.

Do we really need a separate procedure for every machine?

Generally yes, unless a machine meets every condition of the exception in 1910.147(c)(4)(i). OSHA guidance has also said that one written procedure may cover a group of machines that use the same type and magnitude of energy and have the same or similar controls (see OSHA's June 20, 1996 interpretation letter). LotoKit's duplicate feature makes it easy to build variants.

How good is the Spanish?

The built-in steps, energy types, methods and verification text are written in plain shop-floor Spanish. Anything you type yourself (device names, notes) you can enter in Spanish too; the checker reminds you when a custom field has no Spanish. We recommend a bilingual supervisor review your placards before posting.

What does the QR code do?

It opens a mobile-friendly, read-only page with the latest revision of that procedure, including photos. If someone scans an old printout, they see what has changed. Anyone with the link can view that one procedure, so don't put confidential information in it.

Can you print and ship the placards for us?

Yes. From your dashboard, choose "Order printed & shipped", pick hard signs (rigid aluminum) or adhesive vinyl stickers, and add isolation point labels. We email you a quote with price and delivery time within one business day, and nothing is charged until you approve it.

Can I pay once instead of subscribing?

Yes. Buy a one-time Pro pass: 1 year for $449 or 1 month for $45. It doesn't renew automatically, and we email you before it ends so you can decide whether to continue. Handy for company cards and purchase orders.

Can I cancel anytime?

Yes. Manage or cancel your subscription from the billing portal in Settings. If you cancel, you keep access to your existing procedures; creating more than 3 requires Pro.

We're a safety consultant. Can we use LotoKit for clients?

Yes. Many consultants already write these procedures by hand. Email us about a multi-client plan.

Where is our data stored?

On LotoKit's server, protected by HTTPS and your password. Photos are only visible to you, and on the public QR page of the procedure they belong to. You can delete your account and data at any time from Settings.

Get your first machine posted today.

Free for your first 3 procedures. No credit card required.

Build a placard now